Acciona contracted Dando Civil Solutions to complete several water and sewer packages for the Coombabah Sewage Treatment Plant. These works included:
7x water packages (OD315 PE, OD250 PE, OD125 PE, DN150 PVC)
5x gravity sewer packages (DN1200 GRP, DN375 PVC, DN1200 MSCL)
3x rising sewer package (DN900 GRP, DN900 MSCL, DN750 GRP)
10x live connection shutdowns