top of page
Search

2023 Coombabah Sewage Treatment Plant Stage 6

  • Vionna C Fidge
  • Feb 1, 2023
  • 1 min read

Updated: 1 day ago

Acciona contracted Dando Civil Solutions to complete several water and sewer packages for the Coombabah Sewage Treatment Plant. These works included:

  • 7x water packages (OD315 PE, OD250 PE, OD125 PE, DN150 PVC)

  • 5x gravity sewer packages (DN1200 GRP, DN375 PVC, DN1200 MSCL)

  • 3x rising sewer package (DN900 GRP, DN900 MSCL, DN750 GRP)

  • 10x live connection shutdowns




bottom of page