2025 Coomera Connector Stage 1 North
Acciona Georgiou JV contracted Dando Civil Solutions to complete several water/sewer relocation packages, including: 10x water relocations (DN450 MSCL, DN375 MSCL, DN500 MSCL, DN250 DICL, DN200 DICL) 4x gravity sewer relocations (DN375 PVC, DN225 DIPU) 3x rising sewer relocations (DN600 PE, OD280 PE, OD250 PE, DN150 DIPU) Stormwater drainage up to DN1800 RCP 14x live connections


2022 Gold Coast Seaway
John Holland Group contracted Dando Civil Solutions to deliver the new trunk rising sewer as part of Long Term Recycled Water project. Dando Civil Solutions delivered the new trunk rising sewer as part of the Long Term Recycled Water project. These works included: 4x rising sewer (DN900 GRP, DN1000 MSCL, DN1800 MSCL, DN600 DICL) 4x large valve chambers (DN1000) Stormwater drainage (DN1200) 7x live connections