top of page
Search

2025 Gatton-Helidon Highway Upgrade

  • Vionna C Fidge
  • Jul 23, 2025
  • 1 min read

Updated: 2 days ago

The Department of Transport and Main Roads (DTMR) contracted Dando Civil Solutions to deliver several water relocation packages as part of pre-works package in Grantham. These included:

  •  5x water relocations (OD315 PE, DN250 DICL, DN250 MSCL)

  • 2x small water relocations (OD32 PE)

  • 5x enveloper and reinforced concrete encased road crossings

  • 7x live connections




bottom of page