top of page
Search

2020 Brisbane Metro

  • Vionna C Fidge
  • Nov 2, 2020
  • 1 min read

Updated: 2 days ago

Acciona contracted Dando Civil Solutions to deliver several PUP and civil packages as part of the Brisbane Metro project at Buranda Station, South Brisbane interchange and Adelaide Street tunnel. These works included:

  • 4x rising sewer packages (DN450 MSCACL)

  • Suspended pipework installation inside Stanley St tunnel

  • Stormwater drainage (up to DN600)

  • 3x live connection 




bottom of page