2020 Brisbane Metro
- Vionna C Fidge
- Nov 2, 2020
- 1 min read
Updated: 2 days ago
Acciona contracted Dando Civil Solutions to deliver several PUP and civil packages as part of the Brisbane Metro project at Buranda Station, South Brisbane interchange and Adelaide Street tunnel. These works included:
4x rising sewer packages (DN450 MSCACL)
Suspended pipework installation inside Stanley St tunnel
Stormwater drainage (up to DN600)
3x live connection
%20Hi%20res_edited_edite.jpg)












